For network operators

See flexible capacity in the context of your network.

Connect the location, timing and duration of distributed flexibility to network planning and operations.

Talk to Delvrin
01 / THE COORDINATION PROBLEM

Give local flexibility network context.

System-wide capacity totals can hide local constraints. Operators need to understand what response is available in a specific network area and whether it can be sustained.

OPERATING ENVIRONMENT

Distribution areas with changing electrification demand, distributed generation and local connection limits.

DemandAvailabilityConstraintsOperating limits

The Delvrin intelligence layer

Understand the conditions.
Coordinate the response.

An architecture for mapping resource availability to network context and supporting constraint-aware coordination with clear operating boundaries.

01

Associate asset groups with relevant network locations.

02

Identify feasible responses to an expected constraint.

03

Review measured delivery and remaining headroom.

From capacity to action

Make the resources tangible.

Explore how asset state, available capacity and operating requirements come together in a reference portfolio.

ASSET INTELLIGENCEREFERENCE PORTFOLIO

EV Fleet / Cluster 128

Connected vehicles24,840
Average state of charge67%
Operating requirement89% by 07:00
Flexible capacity42 MW
Current actionShift charging

Expected operational value

01

Improve local flexibility visibility

02

Support congestion response

03

Inform network operating decisions

Outcomes depend on the connected assets, operating constraints, data quality and programme design.

The next operating layer

Let’s coordinate
what comes next.

Explore what distributed energy orchestration could mean for your organization.

Talk to Delvrin